1·Frequency signal is a primary input to hydro turbine governor control system.
频率信号是水轮机调速器控制系统基本的输入量。
2·The application of new fuzzy controller in hydro turbine control system is investigated.
最后给出了其在水电机组控制系统中的应用。
3·Abstract: Transformation Project no. 3 hydro turbine governor Zhaoshandu hydropower plant.
摘要:赵山渡水力发电厂3号机组调速器改造项目。
4·The results provided a theoretical basis for understanding the deforming mechanism and selecting reasonable parameters for the die forming of a hydro turbine blade.
采用热力耦合三维刚塑性有限元方法,对水轮机叶片模压成型工艺进行了模拟研究。
5·To gain optimization parameters of hydro turbine PID governor, this paper interprets the approach of optimization designing that uses the Particle Swarm Optimization (PSO) algorithm.
为了保证获得最优水轮机PID调节器参数,本文研究了利用微粒群优化(PSO)算法进行参数优化设计的新方法。
6·I am in charge of three different industrial field, wind turbine, steam turbines, hydro turbines, gas turbines, compressors, textile. Handing rotation speed is the our core competency.
我主要负责三个工业领域的销售包括风力涡轮机汽轮机, 压缩机,纺机。
7·The simulation environment of Multi-axis simultaneous NC machining for blades of large hydro turbine is established through mapping of machining process for NC machine tool, cutter and clamp.
水轮机叶片多轴联动数控加工仿真环境,通过对数控机床、刀具、夹具及等加工过程映射构建。
8·With the development and application of advanced design and manufacturing techniques in China, it has made a great progress of techniques in the industry of hydro turbine in the past 10 years.
随着在先进设计与制造技术方面的研究开发及应用,在过去10年中,我国水轮机行业取得了巨大的技术进步。
9·Plans to deploy three Oyster 2s at the European Marine Energy Centre (EMEC) in Orkney in summer 2011. All three devices will be linked to a single onshore 2.4MW hydro-electric turbine.
根据计划3套Oyster2 装置将在2011年夏天部署在欧洲海洋能研究中心(EMEC),这三个设备将同一个2.4MW的岸上水利发电机组相连接,据估计20个Oyster2 机组可以满足1.2万个家庭的电能需求。
10·Under no-load operation, how to set the PID parameters and prevent misfit among the parameters is concerned in hydro-turbine regulation.
在机组空载工况下如何整定PID参数及防止参数间配合不合理,是水轮机调节关心的问题。